Hotel Remodeling
Hotel remodeling refreshes guest rooms, baths, corridors and lobbies at hotels, inns and bed and breakfasts while the property keeps renting rooms. What matters most is phasing: taking only as many rooms offline as the property can spare, and keeping the work out of the guests' stay.
Taking rooms out of inventory a few at a time
Every room out of service is a room that cannot be sold, so a hotel remodel is planned around occupancy. We start with your booking calendar and agree on how many rooms can be offline at once, which floors or wings make sense to group, and which weeks are slow enough to push harder. On the South Coast, the Cape and the islands, that usually means doing the heavy work outside the summer season.
Rooms are typically done in blocks, often grouped by floor or by plumbing stack, so the noise and dust stay together. Before demolition, we protect the corridor and set up a route for debris and materials that keeps them away from guests. Each block is finished, cleaned and walked with your housekeeping lead before it goes back into inventory.
Guests should not have to see or hear the work. Crews use a separate entrance where the property has one, protect the elevator or take the stairs, and keep the debris route closed off from guest corridors. We agree on quiet hours with you and keep them, even when that means stopping partway through a task.
A sample room helps. Finishing one room first with your final selections lets you see the result, test it with housekeeping and catch problems before they repeat across every room on the floor.
Guest bathrooms, where most of the work hides
The guest bath is where most hotel remodels spend their effort and where most of the surprises turn up. Old tile, slow leaks behind the tub, rotted subfloor at the toilet flange and fans that never really vented anything are common in older properties. We open one bathroom first, see what the building is hiding and adjust the plan before the full run starts.
Bath ventilation is easy to overlook and costly to ignore. A fan that is undersized, or that vents into the attic instead of outside, leaves moisture in the room and the wall, and it shows up later as mold or peeling paint. We check how each bath vents and correct it while the walls are open.
Shower conversions, new tile, vanities and fixtures all have to survive daily cleaning by housekeeping and guests who do not treat them gently. We build them with waterproofing done right under the tile, solid blocking behind grab bars and accessories, and fixtures chosen for durability and easy replacement. The licensed plumber handles valves and supply changes, and we coordinate the work stack by stack.
Accessible guest rooms carry their own requirements under 521 CMR and the ADA, including roll-in showers or accessible tubs, clearances and grab bars. When the remodel touches those rooms or changes how many there are, we build to the architect's details and keep them consistent from room to room.
Halls, stairways and the spaces every guest shares
Corridors and stairs take more wear than any guest room: luggage carts, housekeeping carts and steady foot traffic. Carpet, wall protection, lighting and doors in these areas need to be durable and easy to replace. They also carry the building's life safety systems, including exit signs, emergency lighting, fire alarm devices, and fire-rated doors and walls that have to keep their rating when they are patched or replaced.
Fire alarm and sprinkler work belongs to licensed specialists and the fire department, and we coordinate with them whenever the remodel touches a rated wall, a ceiling or a door. Corridor work is often scheduled at night or during low occupancy, with a clear path kept open for guests at all times.
Guest room entry doors are a project of their own. They are usually fire-rated, with closers and hardware that have to match the rating, and electronic locks bring their own requirements. Replacing or refinishing them is coordinated with your lock vendor so no guest is ever shut out of a room.
Signs belong in corridor work too. Room numbers and exit directions have to be readable and mounted where the accessibility rules call for them, and they are easy to lose track of when a hallway is being redone.
The lobby and front desk while guests check in
The lobby is the first and last thing a guest sees, and it rarely gets to close. We plan lobby work in stages: one side of the room at a time, temporary partitions finished neatly enough that they do not read as a job site, and a temporary front desk if the existing one has to come out. Loud or dusty work lands in the quietest hours, which at most properties means late morning after checkout and before afternoon arrivals.
Front desks and reception areas have accessibility requirements too, including a section of counter at a reachable height. Seating, lighting and finishes in the lobby need to look right and stand up to luggage and constant use, and we help you choose with both in mind.
Lobbies at older properties often carry the building's character: a staircase, original trim, a fireplace guests remember. We protect what stays, work around it carefully and talk with you about what can be restored instead of replaced.
Inns and bed and breakfasts in older buildings
Many New England inns and bed and breakfasts operate in old houses: plaster walls, balloon framing, fieldstone foundations and, now and then, knob-and-tube wiring found behind a wall. These buildings reward careful work and punish shortcuts. Opening a wall in a house from the 1800s means being ready for what is inside it and telling the owner before anyone decides what to do about it.
Houses built before 1978 may contain lead paint, and we follow lead-safe work practices whenever painted surfaces are disturbed. Inside a local historic district, exterior changes like windows, porches or siding usually need review by the historic district commission before work begins.
Throughout the job, the owner or manager hears from us regularly: which rooms are coming back online, what we found and what is next. Changes are written and priced before they happen, and the property is left clean and quiet for guests at the end of every work day.
See the rest of our commercial work, or browse the gallery for rooms we have finished.
How the job runs
Commercial work follows the same order every time, so you always know which part of the job you are in.
- First
A walkthrough comes first, with Steve, at the house. You show him the problem and the wish list; he shows you what the structure and the systems will allow.
- Then
The proposal is written down in plain words. If a decision is still open, it says so, and it says when we need it from you.
- During
Permits are pulled, the work is scheduled, and you hear from us as it moves. If something unexpected turns up, you hear about it before anything changes.
- Last
A final walkthrough with Steve closes the job. You go room by room and nothing is called finished until you agree it is.
Questions people ask about hotel remodeling
Can you remodel without closing the hotel?
Yes, in most cases. We work in blocks of rooms, keep construction routes separate from guest areas and schedule loud work for the quietest hours. Each block goes back into service before the next comes out.
When is the best time of year for hotel remodeling?
Usually during your slow season, which on the Cape, the islands and the South Coast generally means outside the summer months. We plan around your booking calendar so the heaviest work lands when the fewest rooms are sold.
Why start with a sample room?
It lets you see the finished result with your actual selections before the full run. Housekeeping can test it, and any problems get fixed once instead of across every room. It also shows us what the building is hiding behind the walls.
Do accessible guest rooms need to change during a remodel?
If the work touches those rooms or changes how many there are, the requirements of 521 CMR and the ADA apply. Your architect sets the details, and we build to them so every accessible room is consistent.
Can you work on an inn in a historic house?
Yes. Older inns often have plaster, balloon framing and older wiring, so we open walls carefully and tell you what we find before deciding next steps. Exterior changes inside a historic district usually need commission review first.
More commercial work
Commercial Remodeling
Commercial remodeling is changing how an existing space works: walls moved, rooms reassigned and the flow rebuilt for a business that has outgrown its layout.
Commercial Renovations
Commercial renovation brings an aging building back up to standard: worn finishes replaced, tired systems renewed by licensed trades and the code items the work sets off handled properly.
Commercial Construction
Commercial construction is building something that does not exist yet on a commercial property: a small new building, or an addition to one already standing.
Commercial Build-Outs
A commercial build-out takes raw shell space, bare slab and open studs with no ceiling, and turns it into a finished unit a business can open in.
Tenant Improvements
Tenant improvements are the interior work that comes with a lease: what the work letter promises, who approves the drawings and who pays for which piece.
Office Remodeling
Office remodeling is changing an office people still work in every day: private offices, conference rooms, open work areas and break rooms.
Tell Steve what you have in mind
Monday to Friday 7 to 5, Saturday 8 to noon. Based in Raynham and working within about a hundred miles of it. See finished rooms in the gallery.