Staircase Remodeling
Staircase remodeling updates the stair you already have: treads, risers, railings, balusters and newel posts, plus the squeaks and wobbles that come with age. The stair stays where it is, so the work is about making it look right, feel solid and meet code in place.
What changes on a stair that stays in place
Most stairs in older houses are structurally fine and visually tired. Treads are worn hollow in the middle, carpet was laid over oak decades ago, a painted railing has been touched up a dozen times, or a builder-grade stair in a newer colonial looks out of place after the rest of the house was updated. Remodeling keeps the stringers and the location, and replaces or refinishes what you see and touch.
The scope can be small or close to a full rebuild above the stringers. Some jobs are new oak treads with new risers and a refinished rail. Others replace every baluster, the handrail and the newel posts. We look at the stair with you, tell you what is sound and what is not, and put the options in writing so you choose what gets done.
Older stairs also tell you about the house. A stringer that has pulled away from the wall, a landing that has dropped or a gap opening between the treads and the skirt can point to settling or a framing problem below. If we see signs like that, we look underneath before pricing any finish work, because new treads on a moving stair will not stay tight.
If you need a stair somewhere new, or the old one is coming out entirely, that is new construction and it has its own page.
Treads, risers and the squeak underneath
Squeaks come from wood rubbing on wood or on nails: a tread that has shrunk away from its riser, a wedge under the tread that has worked loose, or a stringer that has shifted. Where the underside of the stair is open, from a basement or a closet, we glue and block treads from below without touching the finish. Where it is closed in, we work from above with screws set below the surface and plugged.
When treads are replaced, we measure the rise of every step. Older stairs often have steps of slightly different heights, especially at the top and bottom where flooring was added later. Uneven risers are a real trip hazard, because your feet expect every step to be the same. A new tread can sometimes take up a small difference. A larger one gets discussed before we start.
Pulling carpet off an old stair usually reveals tack strips, staples and paint lines. Some oak treads clean up well. Others are too worn or too patched to save, and new treads look better than an aggressive sanding that leaves the nosings thin.
Nosings matter too. A worn, rounded-over nosing is where feet slip, especially coming down in socks. New treads restore a crisp, consistent nosing on every step, and on an open stair we add a returned nosing at the exposed end so each tread looks finished from the side.
Railings, balusters and newel posts that hold up to code
A loose railing is the most common complaint we hear about older stairs, and it is a safety problem, not a cosmetic one. Newel posts that were never fastened through to the framing start to rock after years of being grabbed at the bottom of the stair. We anchor new or existing newels to the framing with concealed hardware rather than relying on finish nails.
Replaced railings have to meet the current code under 780 CMR, which sets handrail height, guard height along open sides and landings, and the maximum gap between balusters. Many older stairs were built before those rules and have balusters spaced too far apart or a guard too low at the top landing. We point out where yours falls short and include the corrections in the written scope.
Style comes next: square or turned balusters, painted or stained, wood or iron, and a handrail profile that suits the house. In an older home we often match the original profile so the new rail looks like it belongs there.
Opening up a closed-in stair
Many Capes and colonials have a stair boxed in by walls on both sides. Removing one of those walls and replacing it with a guard and balusters opens the stair to the living room and changes how the whole first floor feels. It is also a framing job, because the wall may support the stair stringer, the floor above or both.
We look at what the wall carries before proposing anything. Often the stringer can be supported with new framing and the opening finished with a new guard. If the wall carries floor load, the plan includes a header or beam, and we say so up front. The newly exposed side of the stair then needs a finished skirt board, returned tread ends and trim where only plaster used to be.
Opening a stair can also bring the lead paint question into play. Stair walls in houses built before 1978 usually carry decades of paint layers, and taking one down follows lead-safe setup and cleanup. The work exposes the edge of the floor above as well, which gets a finished nosing or a matching board so the opening looks original.
Keeping the stair usable while we work on it
The stair is usually the only way upstairs, so the work is planned around that. Treads are often replaced in sections so there is always a safe path. When the stair has to be out of service, even for part of a day, you know ahead of time. Dust from sanding is contained, and stains and finishes are chosen with drying time and odor in mind when the family is home.
Finishing a stair takes more patience than most people expect. Each coat of stain or polyurethane needs to dry before anyone walks on it, so we often finish every other tread first and the rest after, which keeps the stair usable through the process. Painted risers and stringers get the same care where they meet the stained treads, because that line is what the eye reads first.
Through all of it, you have one person to call. Steve sets the scope with you, and if a riser turns out to be cracked or a stringer damaged once the carpet comes up, you hear about it the same day, with photos and a plain explanation, before anything is added to the job.
See the rest of our structural work, or browse the gallery for rooms we have finished.
How the job runs
Structural work follows the same order every time, so you always know which part of the job you are in.
- First
Steve comes out and sees it in person. Photos help, but the walls, the floor and the way the room is used tell him more.
- Then
You get a written scope and a price. It says what is included, what is not, and what could change the plan once things are opened up.
- During
While the work runs you deal with one person. You get updates as each stage finishes, and anything that changes the plan is explained first and agreed with you.
- Last
The last visit is a walkthrough, punch list in hand. The job is done when the details are done, not when the crew wants to leave.
Questions people ask about staircase remodeling
Can new treads go over my old ones?
Sometimes, using cap treads over the existing stair. Capping raises each step slightly, so the top and bottom steps need attention to keep every rise even. We check whether capping or full replacement suits your stair better.
Why does my stair squeak, and can it be fixed?
Squeaks come from loose treads, shrunken wood or wedges that have worked out. They can usually be fixed from below if the underside is open, or from above with hidden screws if it is closed. Fixing them is part of almost every stair job we do.
Does my railing have to meet current code?
New railings have to meet the current code for height and baluster spacing. Leaving an existing railing in place does not usually force an upgrade, but if it is loose or unsafe, we will tell you plainly.
Can a painted stair be stained instead?
Sometimes. Paint in old wood grain is hard to remove completely, and in a house built before 1978 the paint may contain lead, which changes how stripping has to be done. New treads and a new rail are often the cleaner path to a stained finish.
Will we be able to use the stairs during the work?
In most cases, yes. We sequence the work so there is a safe way up and down, and if the stair has to be closed for part of a day, we schedule that with you in advance.
More structural work
Finish Carpentry
Finish carpentry is the last layer of woodwork on a remodel: the interior doors, casing, baseboard, window stools, shelving and hardware that every guest sees and every hand touches.
Trim Installation
Trim installation is new door casing, window casing and baseboard in rooms where the doors, walls and floors are staying put.
Crown Molding
Crown molding covers the joint where wall meets ceiling, and in a Massachusetts house that joint is rarely straight or square.
Wainscoting
Wainscoting is paneling on the lower part of a wall, built as raised panel, flat panel, beadboard or board and batten.
Built-In Cabinetry
Built-in cabinetry is storage framed into the house itself: fireplace bookcases, mudroom lockers, window seats, media walls and pantry cabinets.
Structural Repairs
Structural repairs fix framing that has already failed, such as a cracked joist or a sill that has rotted away.
Call and set up a walkthrough
Monday to Friday 7 to 5, Saturday 8 to noon. Based in Raynham and working within about a hundred miles of it. See finished rooms in the gallery.
