Complete Home Renovations
A complete home renovation takes the inside of a house down to the studs and rebuilds it with new insulation, wiring, plumbing, walls and finishes on the original frame. Because the frame is the one thing you keep, its condition gets checked before anything else.
When a gut renovation is the right call
Plenty of Massachusetts houses have good bones and worn-out everything else. The framing is straight, the foundation is sound and the house sits well on its lot, but the wiring is decades old, the plumbing is a mix of three eras, the walls are cracked plaster over no insulation and the finishes were last updated when the previous owners moved in. Patching that house room by room means fighting the old systems in every room. Taking the interior down to the studs means you only fight them once.
This kind of job often comes right after a purchase, before anyone has moved in, which is the easiest time to do it. The house is empty, nobody is working around furniture and every wall can be opened at the same time.
It is not the right answer for every house. If the frame or the foundation turns out to be in poor shape, a gut renovation can end up spending a great deal on a structure that needs more than new finishes. We look at that honestly before you commit, and if we think the house needs a different approach, we will say so.
Checking the frame and foundation first
Once the plaster and lath come off, the house has nowhere to hide. We look at the sills where they sit on the foundation, the joists under old bathrooms and kitchens, the rafters around the chimney and any place where a past owner cut framing to run a pipe or a duct. Older Massachusetts houses often show balloon framing, where the studs run continuously from the sill to the roof, and fieldstone foundations whose mortar has weathered for generations.
Structural repairs come first, before any new system goes in. Rotted sills get replaced, notched joists get sistered or reinforced, sagging floors get brought back as far as the house allows. When a repair calls for an engineer's design, we bring one in and build to the stamped drawing.
You see all of this as it is found. We walk the open house with you, point out what is sound and what is not, and put any added structural work in writing with its price before it starts.
Lead belongs to this stage too. In a house built before 1978, the plaster, trim and windows coming out may carry lead paint, so demolition follows lead-safe work practices, with containment and cleanup that keep dust from settling into the wall cavities you are about to insulate.
Insulation and air sealing to the energy code
An open house is the one chance to insulate the walls properly. Many Massachusetts towns have adopted the stretch energy code, and insulation and air sealing on a gut renovation follow whatever code your town has adopted. That usually means sealing the gaps at top plates, around wiring and pipe penetrations and at the rim joists, then filling the wall cavities fully before the insulation inspection.
Old balloon-framed walls need fire blocking added at each floor so a wall cavity cannot act as a chimney. A house that is much tighter than it used to be also needs a plan for fresh air, and we work that out with the mechanical trades during planning rather than as an afterthought. Windows are part of the same conversation. If the old windows are staying for now, we air seal around their frames; if they are being replaced, the new units are flashed and sealed into the open wall before the interior trim goes back.
We also look at the attic and the basement while everything is exposed. An attic floor can be air sealed and insulated in the same phase, and basement rim joists are easy to reach before the first-floor finishes go in. Where a basement has a history of moisture, we talk about drainage before insulating anything, since insulation over a wet wall only hides the problem.
New wiring and plumbing from the panel out
Gut renovations routinely turn up knob-and-tube wiring, ungrounded circuits, old galvanized supply lines and cast iron drains that have been weeping for years. With the walls open, all of it can come out. Licensed electricians and plumbers do this work, as Massachusetts requires, and each trade has its rough work inspected by the town before the walls are closed.
Planning the systems for the finished house matters. The electrical service and panel are sized for what the house will actually use, outlets and lighting go where the furniture and counters will be, and the plumbing is laid out so fixtures that share a wall share a drain. Getting that right now is far easier than opening finished walls later.
We also record everything before the walls close. Photos of each open wall, taken after inspection, give you a map of where every pipe, wire and piece of blocking sits, which helps the next time you hang something heavy or add an outlet.
Running a rebuild from the inside out
After inspections, the house gets closed in and the rebuild moves through drywall, trim, flooring, cabinets, tile, paint and fixtures. At the start you get a written scope listing what is included and a schedule showing the order of the work. Alongside them comes a list of the selections you will need to make, with the point in the job where each one is needed. Falling behind on selections is one of the most common reasons a renovation stalls, so we flag decisions well before they hold anyone up.
Steve runs the job under his unrestricted Massachusetts Construction Supervisor License and keeps you posted as each phase closes out. On a house where every wall has been opened, regular and honest updates are what keep the owner and the crew working from the same picture of the job.
Changes are written before they happen. With the whole interior open it is tempting to add items on the fly, and some of those additions are good ideas. Each one gets written up with its price and its effect on the schedule, and you approve it before the crew starts. That keeps the scope, the schedule and the finished house in agreement.
See the rest of our remodeling work, or browse the gallery for rooms we have finished.
How the job runs
Remodeling work follows the same order every time, so you always know which part of the job you are in.
- First
Steve walks the space with you. He looks at what is there, asks what you want it to do, and tells you plainly what he sees.
- Then
We put the job in writing: the work, the materials you picked, the order it happens in, and the things that sometimes surprise people in older houses.
- During
The site is kept clean and the house is protected. When an inspection is due you know about it, and when a choice comes up you get it in time to think.
- Last
We finish with a walk through the work and a clean house. Loose ends get a date, and they get done on it.
Questions people ask about complete home renovations
Is a gut renovation better than renovating room by room?
When most of the house needs work, usually yes. Wiring, plumbing and insulation get done once for the whole house instead of being patched into each room. When only a few rooms need attention, a targeted renovation makes more sense, and we will tell you which one fits.
Will the house have to meet current code?
New work done under a permit is built to the Massachusetts State Building Code, 780 CMR, and insulation follows the energy code your town has adopted. The building department sets the specifics, and we handle the permit and inspections for the work we supervise while the licensed trades handle theirs.
What if the frame is in worse shape than we expected?
We show you what we found, explain the repair and give you the added work in writing with its price before it starts. Where the repair needs an engineer, we bring one in. Finding these problems early is one of the reasons to open the whole house at once.
Can we change the layout while the walls are open?
Yes, and this is the best time to do it. Before any wall comes out we check if it carries a load, and if it does, the beam and posts are sized and inspected like any other structural work.
Does the house need to be empty?
For a complete renovation it does. There are no working bathrooms or kitchen for much of the job, and the work produces dust throughout. Many owners schedule it between closing on the house and moving in.
More remodeling work
Mudroom Remodeling
Mudroom remodeling rebuilds the entry your family actually uses, usually the back or garage door, so it can handle a New England winter.
Historic Home Renovation
Historic home renovation is bringing an older Massachusetts house up to modern use while keeping what makes it old: the plaster, the trim, the framing, the proportions.
Aging-in-Place Remodeling
Aging-in-place remodeling prepares the house you love for the next twenty years while nothing is urgent.
Accessibility Remodeling
Accessibility remodeling changes a house or building for a mobility need that exists today.
Whole Home Remodeling
Whole home remodeling reworks every room of an existing house under one plan, one written scope and one schedule.
Home Renovation
Home renovation is targeted work on a house you are living in: a few rooms refreshed, the repairs you have put off finally done and the last owner's shortcuts fixed properly.
Get the job in writing
Monday to Friday 7 to 5, Saturday 8 to noon. Based in Raynham and working within about a hundred miles of it. See finished rooms in the gallery.