Project Management
Project management is how we run our own jobs day to day: the schedule, the material orders, the trades, the inspections, the site and the updates you get. What matters most is that you always know what is happening in your house, what changed, and why.
How a Modern Remodeling job runs day to day
Steve started Modern Remodeling after years of working for guys that lacked communication. On those jobs the homeowner was often the last to learn what had changed and why. His standard for his own company was simple: better communication, and making sure the job is done right. Project management is how that standard turns into a routine.
This page describes how we run jobs where we are the builder. If you have your own plans and builder and want an experienced representative watching them, that is construction management, which has its own page. Here it is our crew, our trades, our schedule, and our responsibility to keep you informed.
In practice that means a few habits we keep on every job, large or small. Someone from our company is accountable for the day's work. Nothing changes without your approval in writing. And the house is left in a state you can live in when we go home. The sections below walk through how each part of the job is handled.
The schedule, written before demo starts
Before work begins, you get a schedule that lays the job out in phases: protection and demo, framing, rough trades, inspections, insulation, drywall, finishes, final. It shows what has to happen before what, and which decisions you need to make by when. Cabinet and tile selections, for example, need to be settled well before the room is ready for them.
A schedule on a remodel is a plan, and plans move. Hidden conditions, inspection timing, weather on exterior work and supplier delays can all shift it. What we will do is tell you when it moves, why, and what the new plan is, rather than leaving you to notice a quiet week and wonder.
We update the schedule as the job goes, so the version in front of you reflects the house as it really is that week.
For the job itself we keep a running list of open decisions. Each item has a date it is needed by and a note on what it holds up if it slips. You can see at a glance what is waiting on you and what is waiting on us.
Material orders and lead times
Many delays on a remodel start with something ordered late. Custom cabinets, special-order windows, certain tile and stone, and some fixtures take weeks to arrive. We order those as soon as the selections are final, track them, and check deliveries against the order when they show up, because a wrong door style found on install day loses far more time than one caught at the curb.
Materials are stored where they will not be damaged or in your way, and we let you know ahead of time when a large delivery is coming so the driveway is clear. Stock materials like lumber and drywall are timed to arrive close to when they are needed, so they are not sitting in your garage for a month.
When you are choosing finishes, we also check the practical side: whether a tile you like is in stock or months out, whether a vanity fits the plumbing we are planning, whether a window size works with the framing. Catching that at selection keeps the schedule intact.
Trades in order, inspections on the calendar
Licensed electricians and plumbers do their work under their own permits, and their visits have to fall at the right moment: after framing and blocking, before insulation. We book them against the actual state of the job and confirm the day before. Inspections are booked the same way, at the stages the state building code sets: rough framing, the trades' rough inspections, insulation, final. If an inspector asks for a correction, we make it and rebook, and you hear what was asked for. On days when no trade is scheduled, our own crew keeps the carpentry moving so the job does not stall waiting for the next visit.
On older Massachusetts houses the order matters even more, because opening a wall can change what a trade needs to do. When the electrician finds knob-and-tube or the plumber finds a cracked cast iron stack, we pause that part of the job, show you what was found, and price any change in writing before the work moves on.
Steve holds an unrestricted Massachusetts Construction Supervisor License and has 20 years in the trade, six of them running this company. Keeping the right people arriving in the right order is a large part of what that experience is for.
Protecting the house and keeping you informed
Most of our clients live in the house while we work. The path in and out gets floor protection, work areas are sealed with plastic and zip doors, and heating and cooling returns near the work are covered so dust stays out of the system. In homes built before 1978, lead-safe practices govern how surfaces are disturbed and cleaned. At the end of each day, tools are put away, debris goes out and walkways are clear.
You hear from us on a rhythm we agree on at the start. For some owners that is a short note at the end of each working day with what was done and what comes next, plus a fuller weekly conversation with Steve. Anything that changes the scope, the price or the schedule gets a phone call, not a text buried in a thread.
At the end of the job we walk the finished work with you room by room, write down anything that is not right, and come back to finish that list. The permit is closed out with a passed final inspection, and you get the record of what was built and what changed along the way.
That is the job as we see it. The building has to be right, and you should never have to chase anyone to find out how it is going.
See the rest of our construction work, or browse the gallery for rooms we have finished.
How the job runs
Construction work follows the same order every time, so you always know which part of the job you are in.
- First
Steve comes out and sees it in person. Photos help, but the walls, the floor and the way the room is used tell him more.
- Then
You get a written scope and a price. It says what is included, what is not, and what could change the plan once things are opened up.
- During
While the work runs you deal with one person. You get updates as each stage finishes, and anything that changes the plan is explained first and agreed with you.
- Last
The last visit is a walkthrough, punch list in hand. The job is done when the details are done, not when the crew wants to leave.
Questions people ask about project management
Who will I be talking to during my project?
Usually Steve. You have one number, (781) 974-4263, and one person who knows where the job stands. Trades and suppliers talk to us, not to you.
How will I know if the schedule changes?
We tell you when it changes, why it changed and what the new plan is. Remodels move for hidden conditions, inspections and supplier delays, and you should hear about it from us first.
Do I need to move out during the work?
Most owners stay. We protect floors, seal off work areas, cover returns near the dust and clean up every day. If a phase will take a kitchen or bathroom out of service, we plan it with you in advance.
When do I need to choose my finishes?
Earlier than most people expect, because some cabinets, windows and tile take weeks to arrive. Your schedule shows the date each selection is needed so nothing holds up the job.
How is project management different from construction management?
Project management is how we run jobs where we are the builder. Construction management is when we represent you on a project someone else is building. The communication standard is the same either way.
More construction work
Interior Build-Outs
Interior build-outs turn unfinished or open space into finished rooms: basements, attics, bonus rooms and commercial tenant units.
General Contracting
General contracting is the role of the one licensed company that holds the permit, hires the trades and answers to you for the whole job.
General Construction
General construction is the hands-on building work on a remodel or addition: demolition, framing carpentry, sheathing, prep for insulation and drywall, then trim and finish.
Construction Management
Construction management puts an experienced builder on your side of a project that already has an architect or a set of plans.
Design-Build Construction
Design-build means one team carries your project from first sketch through drawings, permit and construction.
Pre-Construction Services
Pre-construction is everything that happens before a permit is filed: the site walk, a hard look at the existing house, the zoning and septic questions, and a written scope.