Master Bedroom Additions
A master bedroom addition builds a primary suite as one wing: the bedroom, its own bathroom and a walk-in closet, set apart from the rest of the house. On a septic property the first question is the Title 5 bedroom count, and we answer it before design.
A primary suite as its own wing
Many older houses in Massachusetts put the main bedroom at the top of the stairs, next to the kids, with a bathroom shared down the hall. A master bedroom addition changes that by building a separate wing, usually on the ground floor over a new foundation off the back or side, with the bedroom, a private bathroom and a walk-in closet planned together.
The point of the wing is separation. A suite that shares a wall with the family room or sits over the kitchen does not give you the quiet you are paying to build. We look at where the wing can sit so that a hallway, a closet or the bathroom itself stands between it and the busy parts of the house.
A ground-floor suite also plans ahead. Many owners building one are thinking about the years when stairs get harder. Wider doorways, a curbless shower and solid blocking in the bathroom walls for grab bars later are easy to build in now and hard to add after the tile is up.
On a two-story colonial, a ground-floor suite off the back can be framed with a lower roof that tucks under the second-floor windows, which keeps the house from looking stretched from the yard.
The Title 5 question on a septic lot
If the house is on a septic system, adding a bedroom brings a Title 5 review in Massachusetts. Septic systems are designed around a number of bedrooms, and a new bedroom raises the design flow the system is expected to carry. Depending on the existing system and the local board of health, the answer can be a simple sign-off, an inspection of the system, or a requirement to upgrade it before a building permit is issued.
That is why we ask about septic on the first call. We look at the system's records with you, find out how many bedrooms it was designed for, and talk to the board of health about what they will require. Some towns count any room that could be used as a bedroom, such as a den with a closet, so the official count is not always what the listing says.
On town sewer, the question goes away. On septic, it can decide whether the suite replaces an existing bedroom, whether a current bedroom becomes something else, or whether the system is upgraded as part of the project. It is much better to settle that before you get attached to a floor plan.
None of this is a reason to give up on the suite. It is a reason to know the answer early, because a septic upgrade can change the order of work, the sequence of permits and what the yard looks like for a season.
Laying out the bedroom, bath and closet together
The three rooms work as one plan. The bathroom often sits between the bedroom and the rest of the house, or along an outside wall where the plumbing can drop straight to the basement. The walk-in closet frequently sits between bedroom and bath so you dress on the way through. Where the existing drain stack is and which way the new joists run will push the plan one way or the other, and we sort that out early.
Daylight and the view decide where the windows go and which wall the bed faces. A wing has three exterior walls to work with, which is a real advantage over converting an existing room. We size the bedroom windows for emergency egress, as the building code requires, and place them for privacy from the street and the neighbors.
The bathroom gets the same waterproofing we use on any shower: a membrane behind the tile, a flood test before tile goes in, and an exhaust fan ducted to the outside. Custom tile work is a regular part of what we build, and a primary bath is usually where clients want it most.
Closets get planned with the same care. We lay out the hanging, the shelves and the drawers with you before framing, so the walk-in fits what you own rather than a generic size, and we put lighting where you will actually be looking for things.
Sound, heat and the privacy the wing is for
Quiet comes from construction details. Insulation in the interior walls between the suite and the house, solid-core doors, and outlets placed so they do not sit back to back in a shared wall all help. Where the wing connects to the house, a short hallway or a closet wall does more for sound than any single material.
Heat is the other comfort question. A wing with three exterior walls loses heat faster than an interior room, and a suite that is cold in January is not much of a retreat. The new walls and roof follow the energy code, and in towns that have adopted the stretch code the requirements are higher. Working with licensed trades, we decide whether the existing system can serve the wing or whether a separate zone or a ductless system is the better choice.
Underneath, the foundation sits below frost depth, commonly about four feet, and the new roof is tied into the old one with ice and water membrane at the joint so the valley does not become an ice dam.
Living in the house while the wing is built
Most of a wing is built outside the house. The foundation, framing, roof and windows go up before we open the connection to the existing rooms, so daily life inside is largely undisturbed until that point. When we cut the opening, dust walls go up and floors are protected along the path.
You hear from us the whole way through. Steve started the company after years of working for contractors who did not keep their customers informed, and Modern Remodeling runs the other way. You get the written scope before work begins, a schedule we update as inspections pass, and any change in writing before we act on it.
The site is cleaned and closed each day. At the end we walk the suite with you, open every door and drawer and run every fixture, and we do not call it finished until it is right.
Most suites need a few decisions from you partway through: tile, plumbing fixtures, closet finishes. We tell you when each one is needed, so the work never sits waiting on a choice nobody asked you to make.
See the rest of our additions work, or browse the gallery for rooms we have finished.
How the job runs
Additions work follows the same order every time, so you always know which part of the job you are in.
- First
Steve comes out and sees it in person. Photos help, but the walls, the floor and the way the room is used tell him more.
- Then
You get a written scope and a price. It says what is included, what is not, and what could change the plan once things are opened up.
- During
While the work runs you deal with one person. You get updates as each stage finishes, and anything that changes the plan is explained first and agreed with you.
- Last
The last visit is a walkthrough, punch list in hand. The job is done when the details are done, not when the crew wants to leave.
Questions people ask about master bedroom additions
Do we need a septic upgrade to add a master bedroom?
Not always. It depends on how many bedrooms the existing system was designed for and what the board of health requires under Title 5. We check the records early so the answer shapes the design instead of stopping it.
Can a master suite go on the second floor instead?
It can, either over part of the existing house or as part of a second-story addition. That brings its own structural questions about the foundation and first floor below. A ground-floor wing is often simpler and works better for aging in place.
How big should the walk-in closet be?
Big enough to walk in and turn around with hanging on at least one side, and more if two people share it. We lay out the hanging and shelving with you before framing, so the closet is sized to what you own.
Will the new wing be hard to heat?
Not if it is insulated and air-sealed properly. The new walls and roof follow the energy code, and we plan the heat source for the wing with the licensed trades instead of assuming the existing system can stretch.
Can we stay in the house during construction?
In most cases, yes. The wing is built mostly outside the existing walls, and we seal off the opening when the connection is made. You get notice ahead of any day when water or power will be off.
More additions work
Guest House Construction
A guest house is a detached building for visitors, finished for comfortable stays of a few nights rather than full-time living.
Home Additions
A home addition gives an existing Massachusetts house more conditioned square footage, built on its own footings and tied into the original framing and roof.
Room Additions
A room addition is one modest room built off the side or back of the house, on one foundation with one roof tie-in.
Bathroom Additions
A bathroom addition puts a bathroom where the house never had one, inside new footprint or in a small bump-out.
Kitchen Additions
A kitchen addition pushes the kitchen out past its current exterior wall into new footprint, for kitchens that cannot be fixed inside the walls they have.
Family Room Additions
A family room addition builds a large ground-floor gathering room, usually opening off the kitchen.
Call and set up a walkthrough
Monday to Friday 7 to 5, Saturday 8 to noon. Based in Raynham and working within about a hundred miles of it. See finished rooms in the gallery.
