Monday to Friday 7 to 5, Saturday 8 to noon (781) 974-4263
Call Steve
Home About
Services
Homes Custom Home BuilderLuxury Custom HomesNew Home ConstructionCustom Home Design-BuildModern Home ConstructionContemporary Home ConstructionEstate Home ConstructionHigh-End Home ConstructionNew Construction HomesDesign-Build ServicesMulti-Story Home ConstructionCustom Floor PlansHome Construction ManagementGround-Up Construction
Remodeling Whole Home RemodelingComplete Home RenovationsHome RenovationInterior RemodelingLiving Room RemodelingBedroom RemodelingMaster Suite RemodelingDining Room RemodelingHome Office RemodelingBasement RemodelingAttic RemodelingGarage RemodelingLaundry Room RemodelingMudroom RemodelingHistoric Home RenovationAging-in-Place RemodelingAccessibility Remodeling
Kitchens Kitchen RemodelingCustom Kitchen RemodelingKitchen RenovationsKitchen Design-BuildOpen-Concept Kitchen RemodelingKitchen Layout RemodelingKitchen Cabinet InstallationKitchen Countertop InstallationKitchen Island InstallationKitchen Backsplash InstallationPantry ConstructionButler's Pantry Construction
Bathrooms Bathroom RemodelingMaster Bathroom RemodelingGuest Bathroom RemodelingLuxury Bathroom RemodelingWalk-In Shower InstallationShower RemodelingTub-to-Shower ConversionCustom Tile InstallationBathroom Vanity InstallationBathroom FlooringAccessible Bathroom RemodelingADA Bathroom Remodeling
Additions Home AdditionsRoom AdditionsBathroom AdditionsMaster Bedroom AdditionsKitchen AdditionsFamily Room AdditionsSecond-Story AdditionsSunroom AdditionsGarage AdditionsHome Office AdditionsIn-Law Suite ConstructionADU ConstructionGuest House Construction
Commercial Commercial RemodelingCommercial RenovationsCommercial ConstructionCommercial Build-OutsTenant ImprovementsOffice RemodelingOffice Build-OutsRetail RemodelingRetail Build-OutsRestaurant RemodelingRestaurant Build-OutsCommercial Kitchen ConstructionMedical Office RemodelingDental Office RemodelingMedical Facility ConstructionHotel RemodelingApartment RemodelingMulti-Family RenovationsCommercial Bathroom RemodelingWarehouse RemodelingIndustrial RemodelingCommercial Interior RenovationsCommercial Exterior Renovations
Construction General ContractingGeneral ConstructionConstruction ManagementDesign-Build ConstructionPre-Construction ServicesProject ManagementConstruction Cost PlanningSite DevelopmentStructural ConstructionFramingStructural FramingConcrete ConstructionFoundation ConstructionRoofingSiding InstallationExterior ConstructionInterior Build-Outs
Exterior Exterior RemodelingExterior Home RemodelingHome Exterior RenovationsSiding ReplacementWindow InstallationDoor InstallationExterior Door ReplacementPorch ConstructionScreened Porch ConstructionDeck ConstructionPatio ConstructionPergola ConstructionOutdoor Living SpacesOutdoor Kitchen ConstructionSunroom ConstructionGarage ConstructionGarage Renovation
Structural Structural RepairsStructural RemodelingLoad-Bearing Wall RemovalWall RemovalBeam InstallationFoundation RepairFloor Plan ReconfigurationOpen Floor Plan RemodelingCeiling ModificationsStaircase RemodelingCustom Staircase ConstructionCustom MillworkFinish CarpentryTrim InstallationCrown MoldingWainscotingBuilt-In Cabinetry
Luxury Luxury Home RemodelingLuxury Kitchen RemodelingHigh-End Home RenovationsCustom Interior ConstructionCustom Home InteriorsHigh-End Finish CarpentryCustom CabinetryCustom Built-InsWine Cellar ConstructionHome Theater ConstructionCustom Bar ConstructionHome Gym ConstructionSmart Home ConstructionLuxury Outdoor Living
Specialty Mother-in-Law Suite RemodelingBasement FinishingBasement RenovationGarage ConversionsAttic ConversionsHome Office ConstructionPool House Construction
Restoration Home RestorationHistoric Home RestorationCommercial RestorationWater Damage ReconstructionFire Damage ReconstructionStorm Damage ReconstructionProperty RenovationRental Property RenovationsInvestment Property RemodelingTurnkey Renovations
Areas
Bristol County AcushnetAttleboroBerkleyDartmouthDightonEastonFairhavenFall RiverFreetownMansfieldNew BedfordNorth AttleboroughNortonRaynhamRehobothSeekonkSomersetSwanseaTauntonWestport
Plymouth County AbingtonBridgewaterBrocktonCarverDuxburyEast BridgewaterHalifaxHanoverHansonHinghamHullKingstonLakevilleMarionMarshfieldMattapoisettMiddleboroughNorwellPembrokePlymouthPlymptonRochesterRocklandScituateWarehamWest BridgewaterWhitman
Norfolk County AvonBellinghamBraintreeBrooklineCantonCohassetDedhamDoverFoxboroughFranklinHolbrookMedfieldMedwayMillisMiltonNeedhamNorfolkNorwoodPlainvilleQuincyRandolphSharonStoughtonWalpoleWellesleyWestwoodWeymouthWrentham
Suffolk County BostonChelseaRevereWinthrop
Middlesex County ActonArlingtonAshlandAyerBedfordBelmontBillericaBoxboroughBurlingtonCambridgeCarlisleChelmsfordConcordDracutDunstableEverettFraminghamGrotonHollistonHopkintonHudsonLexingtonLincolnLittletonLowellMaldenMarlboroughMaynardMedfordMelroseNatickNewtonNorth ReadingPepperellReadingSherbornShirleySomervilleStonehamStowSudburyTewksburyTownsendTyngsboroughWakefieldWalthamWatertownWaylandWestonWilmingtonWinchesterWoburn
Worcester County AuburnBerlinBlackstoneBoltonBoylstonBrookfieldCharltonClintonDouglasDudleyEast BrookfieldGraftonHardwickHarvardHoldenHopedaleHubbardstonLancasterLeicesterMendonMilfordMillburyMillvilleNorthboroughNorthbridgeOakhamOxfordPaxtonPetershamPrincetonRutlandShrewsburySouthboroughSouthbridgeSpencerSterlingSturbridgeSuttonUptonUxbridgeWebsterWest BoylstonWest BrookfieldWestboroughWestminsterWorcester
Essex County AndoverBeverlyBoxfordDanversEssexGeorgetownGloucesterGrovelandHamiltonIpswichLawrenceLynnLynnfieldManchester-by-the-SeaMarbleheadMerrimacMethuenMiddletonNahantNewburyNewburyportNorth AndoverPeabodyRockportRowleySalemSalisburySaugusSwampscottTopsfieldWenhamWest Newbury
Barnstable County BarnstableBourneBrewsterChathamDennisEasthamFalmouthHarwichMashpeeOrleansSandwichTruroWellfleetYarmouth
Dukes County AquinnahChilmarkEdgartownOak BluffsTisburyWest Tisbury
Nantucket County Nantucket
Hampshire County AmherstBelchertownGranbyHadleyHatfieldPelhamSouth HadleyWare
Hampden County BrimfieldHollandLudlowMonsonPalmerWalesWilbraham
Gallery Blog Contact
Call Steve, (781) 974-4263
Skip to content

Accessible Bathroom Remodeling

An accessible bathroom remodel fits the room to a particular person in your household: a parent moving in, a spouse coming home after surgery, or you planning to stay put. The measurements come from that person and how they move, not from a catalog of grab bars.

Finished bathroom with white vanity, stone-look top, octagonal mirror, sconce and grey wood-look tile floor

Start with the person who will use the room

Before we talk about tile, we want to understand who the bathroom is for. Does she use a walker, a cane or a wheelchair? Which side is stronger? Does he shower standing, seated or with someone helping? Will a caregiver need room to stand beside the toilet or reach into the shower? Those answers set the grab bar heights, the shower entry and the door width more than any rulebook does.

If an occupational or physical therapist has worked with the family, their notes are welcome on the walkthrough. We would much rather build to what a therapist has observed than to a guess.

We also ask about the future. A bathroom built for someone who uses a cane today might need to work with a walker in a few years. A little planning now, like wider clear space or blocking in more places, saves tearing the room apart later.

The route to the bathroom matters too. A doorway that is too narrow, a step down into the room or a hallway with a tight turn can matter as much as anything inside it, and those are easier to address in the same project.

Solid blocking behind the wall for grab bars

Grab bars are only as strong as what they are fastened to. While the walls are open, we install solid wood blocking between the studs everywhere a bar might go now or later: beside the toilet, along the shower walls, near the seat and at the shower entry. Drywall anchors do not belong in a grab bar.

Before the walls close, we photograph and measure the blocking and give you a record, so anyone adding a bar in five years knows exactly where to drill.

Grab bars do not have to look clinical. They come in finishes that match the faucets, and some double as towel bars or shelf rails while still being rated as grab bars. A towel bar that is not rated as a grab bar should never be used as one, and we will not install one where someone is likely to grab it.

Placement is set to the person, not to a diagram. A bar beside the toilet goes where that person's hand naturally lands as they sit and rise. A vertical bar at the shower entry helps someone steady themselves while stepping in. We will often hold a bar against the open framing with the person present and mark it, which is the surest way to get it right.

A shower you can walk or roll into

Stepping over a tub wall is often the first thing that becomes hard. The answer is usually a shower with a very low curb or no curb at all. A zero-threshold entry on a first floor can often be built by recessing the subfloor so the shower floor slopes to a drain without a lip. On an upper floor the framing decides what is possible, and we tell you before promising it.

Inside, a handheld shower on a slide bar lets someone wash seated and lets a caregiver direct the water. A fold-down seat or a built-in bench goes where it can be reached from the entry. The valve goes where it can be reached from the seat and from outside the spray. Floor tile needs real traction, so we steer toward smaller tile with more grout lines.

A curtain on a shower rod can be easier for a caregiver than a glass door. That choice is about who helps, not appearance.

Water containment gets extra care in a curbless shower. The floor slopes to the drain over a longer run, the waterproofing extends well past the shower area, and a linear drain at the entry or back wall keeps the water where it belongs. Done properly, the bathroom floor stays dry without a curb to hold it back.

Doors, toilet height and the smaller changes that add up

Many older bathroom doors are too narrow for a wheelchair or walker. Widening one means reframing the opening, and if it sits in a load-bearing wall, a proper header. We check that before anyone cuts. A door that swings out of the room, or a pocket door, means a person who falls against it does not block the way in.

A comfort-height toilet is easier to sit on and stand up from. Lever handles on faucets and doors work for hands that do not grip well. A vanity with open knee space works for someone seated. Brighter, even lighting and a contrast between floor and wall color help anyone with weaker eyesight, and a low night light makes a two in the morning trip safer.

None of these are dramatic on their own. Together they decide whether the person can use the room alone.

Most of these changes need the walls open at some point, which is why it pays to do them together in one project. Running new wiring for brighter lights or moving a toilet drain is far simpler while the room is already apart, and licensed electricians and plumbers handle that work under their own permits.

Built for the person, still looking like your house

An accessible bathroom does not have to look like a hospital. The same tile, fixtures and finishes you would choose anyway can be set to the right heights and clearances. Most visitors will never notice the blocking or the extra floor space.

Families often do this work with someone already living in the house or about to come home, so timing matters. We plan the order of work around how the household needs to function, keep you updated as each step finishes, and leave the house clean every day.

Throughout the project, you deal with Steve and the people doing the work, never a call center. If the person the bathroom is for has a hospital discharge date or a move-in day, we plan the schedule around it and tell you early if anything threatens it.

When the bathroom is finished, we walk it with the person who will use it. They try the seat, reach for the controls and use the bars, and if a handle or shelf is in the wrong spot, it gets moved before we leave.

See the rest of our bathrooms work, or browse the gallery for rooms we have finished.

How the job runs

Bathrooms work follows the same order every time, so you always know which part of the job you are in.

  1. First

    Steve comes out and sees it in person. Photos help, but the walls, the floor and the way the room is used tell him more.

  2. Then

    You get a written scope and a price. It says what is included, what is not, and what could change the plan once things are opened up.

  3. During

    While the work runs you deal with one person. You get updates as each stage finishes, and anything that changes the plan is explained first and agreed with you.

  4. Last

    The last visit is a walkthrough, punch list in hand. The job is done when the details are done, not when the crew wants to leave.

Questions people ask about accessible bathroom remodeling

Does an accessible bathroom in my home have to meet ADA requirements?

Generally no. The ADA Standards apply to public and commercial buildings, not a private single-family home. We often use them as a reference for clearances and heights, then adjust to the actual person, which is usually the better result at home.

Can grab bars be added later on a tiled wall?

Yes, if there is blocking behind the tile. That is why we install blocking in every likely location while the walls are open and give you a record of where it is. Without blocking, adding a safe grab bar later means opening the wall.

Can a curbless shower be built on a second floor?

Sometimes, but it depends on the joists. Recessing the floor for a level entry may require reworking the framing. We look at it during the walkthrough and tell you plainly what it would take.

Can we stay in the house while the bathroom is remodeled?

Most families do. If it is the only bathroom, we plan the sequence to keep the toilet out of service for as little time as practical and tell you the exact days in advance.

Will an accessible bathroom hurt resale?

Usually not when it is designed well. A low-entry shower, wider door and comfort-height toilet appeal to many buyers, and finishes that match the rest of the house keep it from reading as medical.

More bathrooms work

All 12 bathrooms services

Custom Tile Installation

Custom tile installation means tile set to your room: the layout planned around the fixtures, the cuts placed where nobody looks, and the substrate built flat and waterproof first.

Bathroom Vanity Installation

Bathroom vanity installation replaces the cabinet, top, sink and faucet while the rest of the room stays as it is.

Bathroom Flooring

Bathroom flooring work replaces a floor that has cracked, lifted or gone soft while the walls and fixtures stay where they are.

ADA Bathroom Remodeling

ADA bathroom remodeling builds a restroom to the published ADA Standards and Massachusetts 521 CMR, where compliance is measured with a tape rather than judged by eye.

Bathroom Remodeling

A bathroom remodel is the whole room rebuilt at once: layout, plumbing, ventilation, tile and fixtures under one permit and one written scope.

Master Bathroom Remodeling

A master bathroom remodel reworks the suite bath two people use every morning, often with double vanities, a separate toilet room or space borrowed from a closet.

Call and set up a walkthrough

Monday to Friday 7 to 5, Saturday 8 to noon. Based in Raynham and working within about a hundred miles of it. See finished rooms in the gallery.