Home Construction Management
Home construction management is for owners who already have plans and need someone to run the build. Steve schedules the trades, books the inspections, orders materials and keeps you informed on progress and costs, so the design you paid for gets built the way it was drawn.
When you already have the plans
Many owners come to us with a finished set of drawings from an architect or designer, sometimes with that designer still involved. They do not need a new design. They need someone to take the plans and run the job: schedule the work, manage the trades, deal with the town and tell them what is going on.
That is what construction management covers. Steve runs the build under his unrestricted Massachusetts Construction Supervisor License, the license that covers structural work on one and two family homes. You keep your designer and your plans. We handle the site, the people on it and the communication back to you.
How the arrangement is set up, whether we hold the trade contracts or you do and how fees are structured, gets written into the agreement before work starts, so everyone knows who is responsible for what.
Construction management also suits owners who want a hand in choosing some of the trades, or who have a relationship with a cabinet shop or tile setter they want to keep. We can work with those people, fold them into the schedule and hold them to the same standards as everyone else on the site.
Scheduling trades and booking inspections
A house is built in an order that does not bend much. Excavation and foundation, framing, then rough plumbing, electrical and mechanical by their licensed trades, then rough inspections, insulation and its inspection, drywall, trim, finishes and the final. When one trade is late, everyone behind them waits. Most delays on a poorly run job come from trades showing up to work that is not ready for them.
We build the schedule, confirm trades ahead of their start, make sure the work before them is finished and book inspections with the town building department at the right moment. When an inspector asks for a correction, we get it done and rebooked rather than letting it sit.
Weather, lead times and inspection availability all move schedules. When something slips, you hear about it from Steve along with what it affects and what we are doing about it.
The site gets kept too. Debris goes into the dumpster at the end of the day, tools get put away and open work gets covered against weather. A clean site keeps people safe, keeps materials in good shape and tells every trade walking in that this job is run carefully. It also keeps the neighbors on your side, which matters on a long build.
Materials, deliveries and lead times
Windows, doors, cabinetry, specialty tile and some fixtures can take many weeks to arrive, and a missing item can stop a job cold. We review the plans and selections for long lead items early, get orders in when the information is final and track them until they arrive.
Deliveries get checked against the order when they land, not when they are being installed. Wrong sizes, damaged boxes and missing parts are caught while there is still time to fix them. Materials on site are stored off the ground and out of the weather, and finished goods like cabinets and trim stay protected until they go in. When a delivery is short or damaged, the supplier hears about it that day and you hear about it from us the same day.
We also handle the material questions that come up mid-job. A discontinued tile, a window size the supplier changed, a fixture that does not fit the vanity the designer drew. When that happens, we bring you and your designer the options and what each does to cost and schedule, and order nothing until you choose.
Reporting progress and costs to the owner
The reason Steve started this company was years of working for builders who did not tell their customers what was going on. On a managed job, reporting is the work. You get regular updates on what was completed, what is scheduled next, which inspections passed, what is on order and what decisions are waiting on you.
Costs get reported the same way. You see what has been spent against the plan, which items are running over or under and why, and what is under contract but not yet billed. Changes are written up before they are built, with what they do to the price and the schedule, and you approve them first.
If something goes wrong, such as a failed inspection, a damaged delivery or water damage found when a wall is opened during a renovation, you hear about it promptly with a proposed fix. Nobody learns about a problem from an invoice.
Photos are part of the record. Before insulation and drywall go up, we photograph the walls and ceilings so you have a picture of where the plumbing, wiring, blocking and framing sit. Years later, that file saves someone from cutting into the wrong spot to hang a picture or add an outlet.
Working with your designer, not around them
When an architect or designer is involved, construction goes better if the builder treats them as part of the team. Questions about the drawings go to them in writing, and their answers get recorded and shared with the trades. If the field conditions do not match the plans, we bring it to both you and the designer before work continues. That paper trail keeps the job honest and helps if anyone needs to look back later at why something was built the way it was.
We will also tell you when something on the plans will be hard to build or likely to cause trouble later, and offer an alternative for the designer to review. The final call stays with you and your designer. Our job is to build what was agreed, to keep it on track and to keep you informed every step of the way.
When the house is finished, we walk it with you and your designer and write up a punch list of anything that needs attention. Each item gets fixed and checked off, the final inspection is booked and you receive the paperwork the town issued along the way, so the record of the build stays with the house.
See the rest of our homes work, or browse the gallery for rooms we have finished.
How the job runs
Homes work follows the same order every time, so you always know which part of the job you are in.
- First
Steve walks the space with you. He looks at what is there, asks what you want it to do, and tells you plainly what he sees.
- Then
We put the job in writing: the work, the materials you picked, the order it happens in, and the things that sometimes surprise people in older houses.
- During
The site is kept clean and the house is protected. When an inspection is due you know about it, and when a choice comes up you get it in time to think.
- Last
We finish with a walk through the work and a clean house. Loose ends get a date, and they get done on it.
Questions people ask about home construction management
What does a construction manager do on a new house?
A construction manager runs the build: scheduling trades, booking inspections, ordering and tracking materials, keeping the site and reporting progress and costs to the owner. On our jobs that is Steve, working under his Massachusetts Construction Supervisor License.
Can I keep my own architect if you manage the construction?
Yes. We work from your designer's plans and route drawing questions to them in writing. If something on site does not match the plans, we bring it to you and the designer before continuing.
How will I know what is happening on the job?
You get regular updates from Steve on completed work, upcoming work, inspections, deliveries and decisions waiting on you. You can also call him directly. Keeping owners informed is the reason the company exists.
How are costs tracked on a managed project?
You see what has been spent against the plan, what is still on order and where items are running over or under, with the reason. Changes are written up with their effect on price and schedule before any work happens.
Who books the inspections with the town?
We do. We schedule inspections with the building department when the work is ready, attend them and handle any corrections an inspector asks for, then rebook. Plumbing and electrical inspections are tied to the licensed trades doing that work.
More homes work
Modern Home Construction
Modern home construction strips a house down to clean planes, large glass and very little trim.
Contemporary Home Construction
A contemporary home pairs current design with shapes New England already knows: open plans under pitched roofs, mixed cladding and bigger windows in a familiar form.
Estate Home Construction
Estate home construction covers the whole property, not only the main house: wings, detached garages, guest quarters, long driveways, heavy site work and septic design.
High-End Home Construction
High-end home construction is about how the work gets checked, protected and recorded while the house goes up.
New Construction Homes
A new construction home gives you current code, current insulation and a layout you chose, in place of the surprises an older New England house keeps behind its plaster.
Design-Build Services
Design-build means one team is responsible for both designing your project and building it, under one agreement.
Tell Steve what you have in mind