Trim Installation
Trim installation is new door casing, window casing and baseboard in rooms where the doors, walls and floors are staying put. The part that matters most is where new trim meets the things that are not changing, because that is where a re-trim either looks original or looks patched.
When the trim changes and the rest of the room stays
This is the job owners call about when the doors are fine, the floors are staying and the walls were just painted, but the casing and base look tired, mismatched or wrong for the house. A 1990s flip may have put thin clamshell casing into a 1910 four-square. Three rounds of repairs may have left three base profiles in one hallway. Or the trim is sound but painted so many times the detail is gone. We replace door casing, window casing, baseboard and shoe, and leave everything else alone.
Because the scope is narrow, the planning is about edges. New casing has to land correctly against existing door jambs, which are often not flush with the wall. New base has to meet stair skirts, fireplace hearths, kitchen toe kicks and built-ins that are not moving. We look at every one of those meetings during the walkthrough, so the written scope covers them instead of somebody discovering them on install day.
If you want doors hung, closets fitted out or the whole final layer of woodwork handled at once, that is finish carpentry, a broader job with its own page.
Pulling old trim without wrecking the plaster
In older Massachusetts homes the trim was often installed before the finish coat of plaster, or the plaster was troweled right up to it. Yanking that casing off with a flat bar can take chunks of wall with it and turn a trim job into a plaster repair. We score the paint line first, work each piece off gradually with a wide block behind the bar, and pull nails through the back when a piece is being saved for reuse or as a pattern.
Houses built before 1978 are likely to have lead paint on the trim itself. Removal follows lead-safe practice under the EPA renovation rule: plastic down, dust controlled where the cutting happens, careful cleanup, and a check of the work area before the room goes back into use. Families with small children should know that up front, and we raise it at the first visit rather than on the morning of demo.
Once the old trim is off, we deal with what was hiding behind it. Gaps at the drywall edge, broken plaster at the corners, rotted shims and old nails get patched or squared up, so the new pieces have something solid and flat to land on.
Re-trimming after new floors or replacement windows
Two other projects create most re-trim work. The first is new flooring. Hardwood laid over an old subfloor, or tile set on a mortar bed, raises the floor, and the old base either comes off and goes back higher or gets replaced. Shoe molding nailed to the old floor will not suit the new one. We set base after the flooring is down, so it sits right on the finished surface instead of floating above it.
The second is replacement windows. An insert window sits inside the old frame, which changes the reveal and often leaves the interior trim looking crude around the new sash. A full-frame replacement takes the old casing away entirely. Either way the inside needs extension jambs built out to the face of the plaster, then a new stool, apron and casing fitted to the new unit. That step decides whether a window job looks finished.
When the flooring or windows are done by someone else, we coordinate with them and measure after their work is complete, never before.
Choosing a casing and base profile that suits the house
Trim tells people when a house was built, so the right profile depends on the house. A Federal or Greek Revival home often carries wide flat casing with a back band. A Victorian may have fluted casing with corner blocks. A 1950s ranch had narrow, plain trim, and a modern renovation of one often goes to flat stock with square edges. We bring samples and hold them up on your actual walls, because a casing that looked right in a showroom can look heavy in a room with eight-foot ceilings.
Proportion carries the decision. Base height generally follows ceiling height, and casing width follows the size of the doors and windows. Where original trim in other rooms is staying, matching it is usually the right call even when a newer profile is tempting. A house with two trim styles reads as two renovations.
Material choices are simpler here than on larger woodwork jobs: primed poplar or finger-jointed pine for paint, MDF only in dry rooms, and solid hardwood where it will be stained.
Corners deserve a word. Inside corners on base are coped rather than mitered so they stay closed through the heating season, and outside corners are glued as well as nailed. Where casing meets base, the base should be a touch thinner than the casing so the casing reads as the stronger edge; when an existing jamb sits proud of the wall, we build the casing out or back-cut it until that relationship holds on every opening.
Trim work in a home you are living in
Most trim jobs happen with the family at home. We confirm the plan the day before, cover the floors, set up cutting outside or in the garage where possible, and keep doorways clear. Rooms are vacuumed at the end of each day and the house is livable every night.
We also check the doors while the casing is off. A door that rubs or will not latch often has a loose jamb, and fixing it with the casing removed takes a few minutes. Once new casing is nailed over a bad jamb, the same fix means pulling new trim. If a door needs more than an adjustment, we tell you and price it separately rather than folding it in without asking.
You will know what is going on. If a jamb is too far out to case without rework, or a plaster patch turns out bigger than expected, we tell you then and explain the options. When the trim is up, nail holes are filled and paint-grade joints caulked, and it is left ready for paint, or painted when that is in the scope. Steve walks the finished rooms before we call the job done.
See the rest of our structural work, or browse the gallery for rooms we have finished.
How the job runs
Structural work follows the same order every time, so you always know which part of the job you are in.
- First
Steve walks the space with you. He looks at what is there, asks what you want it to do, and tells you plainly what he sees.
- Then
We put the job in writing: the work, the materials you picked, the order it happens in, and the things that sometimes surprise people in older houses.
- During
The site is kept clean and the house is protected. When an inspection is due you know about it, and when a choice comes up you get it in time to think.
- Last
We finish with a walk through the work and a clean house. Loose ends get a date, and they get done on it.
Questions people ask about trim installation
Do I need to remove the old baseboard before new flooring goes in?
Usually, yes. Pulling the base lets the flooring run to the wall and lets the base go back at the right height above the new surface. Leaving it and adding shoe to cover the gap works only when the floor height barely changes.
Can you match the casing in the rest of my house?
In most cases. We take an original piece or trace the profile and look for a close stock match first. When nothing comes close, a matching profile can be milled, which our custom millwork page covers.
Will taking off old trim damage my plaster walls?
It can if the trim is ripped off. We score the paint, work it loose slowly with blocking behind the bar, and patch any plaster that does come loose before the new trim goes on.
Is the new trim painted when you leave?
That depends on the scope we agree on. Trim is always left filled, caulked and ready for paint, and we can include priming and finish painting so the room is complete when we pack up.
What is shoe molding and do I need it?
Shoe is the small rounded strip at the bottom of the baseboard that covers the gap where base meets floor. On old, uneven floors it hides the variation better than base alone. On flat new floors with base scribed tight, some owners prefer to leave it off for a cleaner look.
More structural work
Structural Repairs
Structural repairs fix framing that has already failed, such as a cracked joist or a sill that has rotted away.
Structural Remodeling
Structural remodeling is the framing side of a remodel that changes how the house is built, from new openings to rebuilt floors tied into old framing.
Load-Bearing Wall Removal
Load-bearing wall removal takes out a wall that holds up a floor or roof and puts in a beam that does the same job.
Wall Removal
Wall removal takes out a non-bearing partition and leaves the room around it looking as if it was never divided.
Beam Installation
Beam installation settles what a new beam is made of, whether it sits flush or below the ceiling, and what holds up its ends.
Foundation Repair
Foundation repair is the work at the bottom of the house, where rotted sills, crumbling fieldstone mortar and posts without real footings show up.
Show Steve the room
Monday to Friday 7 to 5, Saturday 8 to noon. Based in Raynham and working within about a hundred miles of it. See finished rooms in the gallery.
