Kingston houses from the 1980s, updated properly
Kingston's median home was built in 1980, which puts much of the town's housing at the age where roofs, decks, windows and original kitchens come due around the same time. Modern Remodeling plans that work in the right order.
A coastal town built mostly in the middle decades
Census figures show about 13,700 people in Kingston and roughly 5,600 homes, with a median build year of 1980. About 15 percent of the homes predate 1940 and about the same share were built since 2000, so most of the housing sits in the decades between. Close to four in five are single-family detached, and about 86 percent are owner-occupied.
Kingston is on the coast about 16 miles east of Raynham, and homes near the water deal with salt air on top of the usual New England freeze-thaw. For a house built around 1980, that exposure mostly shows up as worn exterior trim, tired flashing and decks that have given what they had. Homes farther inland see less of the salt, but every house in town gets the same winters.
A 1980 house is old enough to need real work and young enough that the bones are usually straight. Many have serviceable framing, a basement under at least part of the house, and a layout of separate rooms that owners now want to connect. That is a good starting point for a remodel that changes how the house lives without starting over.
What a forty-year-old house usually needs
Houses from around 1980 were built before today's energy codes, often with modest attic insulation and ventilation that does not keep the roof deck cold in winter. That combination is a common cause of ice dams. When we replace a roof, we look at the attic first, because new shingles over the same heat loss will dam up again. Bath fans that vent into the attic instead of outside add to the moisture problem, and we reroute them while the roof is open.
Decks from that era are often at the end of their life, and the trouble is usually hidden. The ledger, where the deck attaches to the house, matters most, and older decks were frequently hung without proper flashing or through-bolts. A replacement starts with footings below frost depth, commonly about four feet, and a ledger that is flashed and bolted correctly.
Inside, kitchens and baths are often original or on their second round of cosmetic updates. At this point owners usually want the kitchen reworked rather than refreshed, with the layout changed and the old soffits taken out. Wiring from that era is usually serviceable, but a licensed electrician should check panel capacity before a new kitchen adds circuits.
Doing the work in the right order
When several things are due at once, the sequence saves money and rework. If water is getting in, the roof and exterior come before interior finishes. Electrical and plumbing rough-ins by the licensed trades come before insulation, and insulation is inspected before drywall. Each stage is permitted through the town building department under 780 CMR. Inspections are scheduled as each stage is ready, and you know which one is coming.
The newer homes in town, about one in seven, raise different questions: finishing a basement, adding a bath, opening a kitchen to a family room. Those are layout projects with sound framing behind them. In the roughly 15 percent of homes built before 1940, the familiar older-house issues apply instead: plaster, balloon framing and lead-safe work on painted trim.
Whatever the scope, you get it in writing first and hear from us as each stage closes out. Steve's standard is simple: if it is not right, his name does not go on it.
Work that fits Kingston houses
Kitchen Remodeling
80% of homes in Kingston are single-family houses, where the kitchen is usually the first big job.
Home Additions
Single-family lots make up 80% of Kingston, and that is where an addition fits.
Open Floor Plan Remodeling
About 15% of Kingston homes went up after 2000, and those layouts are the ones people open up.
Bathroom Remodeling
The median Kingston home dates to 1980; its original baths are due.
Basement Finishing
Most of the 5,614 homes in Kingston sit on a basement worth finishing.
Kitchen Renovations
86% of Kingston homes are owner-occupied, the households that refresh a kitchen in place.
Close to Kingston
The nearest towns we cover, by straight-line distance. Kingston is part of Plymouth County.
- Plympton4 miles southwest. About 2,923 people; median home built 1981.
- Duxbury4 miles northeast. About 16,041 people; median home built 1974.
- Halifax6 miles west. About 7,728 people; median home built 1981.
- Pembroke6 miles northwest. About 18,330 people; median home built 1977.
- Carver8 miles south. About 11,641 people; median home built 1979.
- Hanson8 miles northwest. About 10,619 people; median home built 1972.
Kingston questions
Why do ice dams keep forming on my 1980s Kingston house?
Usually heat escapes into the attic and warms the roof deck, melting snow that refreezes at the cold eaves. Fixing insulation and ventilation is part of a proper roof job, not an add-on.
How do I know if my deck needs replacing?
Look at the ledger connection to the house, the posts at grade and any soft decking near the house wall. Decks built around 1980 often lack flashing at the ledger, which is where rot starts.
Should I do the roof or the kitchen first?
If any water is getting in, the exterior comes first, because new finishes under a leaking roof get ruined. Otherwise we look at what is closest to failing and set the order with you.
Does finishing a basement in a newer Kingston home need a permit?
Yes. Finishing a basement with framing, electrical and plumbing is permitted work with inspections along the way. Egress also comes into it if anyone will sleep down there.
How old are the houses in Kingston?
By census figures the median Kingston home was built in 1980. About 15% of the housing predates 1940 and about 15% went up after 2000. Those numbers shape what we check first at the walkthrough.
Is Kingston mostly owners or renters?
About 86% of Kingston homes are owner-occupied and about 80% are single-family detached houses. We ask early which kind of job it is, because it changes the materials and the schedule.
Does Modern Remodeling work in Kingston?
Yes. Kingston is about 16 miles east of our base in Raynham, inside the roughly hundred-mile area we cover. Call (781) 974-4263 to set up a walkthrough.
Show Steve the room
Monday to Friday 7 to 5, Saturday 8 to noon. Based in Raynham and working within about a hundred miles of it. See finished rooms in the gallery.
