Tenant Improvements
Tenant improvements are the interior work that comes with a lease: what the work letter promises, who approves the drawings and who pays for which piece. Getting that division clear in writing before construction starts saves more trouble than anything we do with a hammer.
Reading the work letter before pricing anything
Most leases with improvement work attach a work letter or exhibit that says what the landlord delivers and what the tenant builds. Some are a page long and vague. Others spell out the base building condition, the allowance, the approval steps and the deadlines in detail. Before we write a proposal, we read the work letter alongside the lease drawings, because that document decides who pays for what and who we answer to for each part.
We look for the items that cause arguments later: whether restrooms are landlord or tenant work, who handles sprinkler modifications, who brings heating and cooling to the space, and what happens if the base building is not delivered as promised. Where the letter is unclear, we say so in writing, so landlord and tenant can settle it before construction rather than in the middle of it.
Our proposal then follows the same split the lease uses, so each party can see which line items belong to them.
If you are the tenant, we can walk the space with you before you sign. Seeing the unit with a builder can turn up items worth raising with the landlord, like a rooftop unit near the end of its life or a restroom that will never meet accessibility rules without being rebuilt. Who pays for those is far easier to settle before the lease is signed than after.
Approvals between landlord and tenant
On a tenant improvement job there are usually two approvals before the building department sees a drawing. The tenant approves the design, and the landlord approves it for the building. Landlords care about structure, the roof, shared systems and anything that affects other tenants. Many have their own rules for contractors in the building, covering insurance certificates that name the landlord, hours for loud work and how the loading area can be used.
We provide what the property manager asks for, follow the building rules and keep both parties copied on schedule changes. When the landlord's review sends the drawings back with changes, we price those changes separately, so the tenant can see what came out of the landlord's review.
Then comes the permit. Commercial permits usually require drawings from a registered architect or engineer, and the building department applies 780 CMR, 521 CMR and the ADA to the new layout regardless of who is paying for it.
Some landlords have their own base building standards: a specified ceiling tile, door hardware, lighting or storefront sign. We build to those standards where the lease requires them and tell the tenant early where they limit the choices.
Keeping responsibilities clear during construction
Splits between landlord work and tenant work are easy on paper and messy in the field. In many leases the sprinkler main belongs to the landlord and the branch lines in the tenant space belong to the tenant, yet both are handled on the same day by the same licensed sprinkler contractor. We track those splits on every invoice and change order, so the right party pays for the right piece and nobody has to reconstruct it from memory afterward.
Changes follow the same rule. Each one notes who asked for it, which side of the lease it falls on and what it does to price and schedule. It gets approved in writing by the person paying before the work proceeds.
Allowances are tracked the same way. If the landlord is funding part of the work through an improvement allowance, we provide the documentation the lease calls for, such as paid invoices and lien waivers, so reimbursement goes smoothly.
Closeout paperwork is part of the same discipline. Landlords often want as-built drawings, permit sign-offs, product information from equipment suppliers and a list of finishes for future repairs. We gather it as the job goes, so it is ready when the tenant moves in and nobody spends weeks chasing it.
When the landlord is the one building
Sometimes the landlord builds the improvements before a tenant is found, or builds a space to a tenant's plan and recovers the cost through rent. In that case we work for the landlord and the lines are simpler, but the tenant's needs still shape the drawings, and we keep the tenant informed where the lease gives them a say.
Property managers with several spaces also turn units between tenants: taking out the last tenant's walls, patching floors and ceilings, and returning the unit to a clean, rentable condition. That work is smaller, but it follows the same rules for permits, building hours and clear paperwork about what was done and who paid for it. We document the condition of the space before and after, which helps the landlord settle the departing tenant's obligations under the old lease.
Lease dates and the delivery schedule
Tenant improvements live on deadlines that come from the lease: the date the premises are delivered, the date rent starts, and sometimes a penalty if the tenant is not open by a certain day. We build the schedule from those dates and show both parties which approvals and long-lead items could hold things up.
Inspections follow the permit as on any commercial job: rough framing, the licensed trades' rough inspections, any sprinkler or fire alarm changes and a final. We book them, attend them and send both parties the results, because a failed inspection can matter to a lease date as much as to the schedule.
Communication is the job here more than anywhere. Steve built this company on keeping customers informed, and on a tenant improvement the tenant, the landlord and the property manager all need to know where things stand. You get regular updates, and an early warning the moment something threatens a lease date.
At the end, we close out the punch list together, hand over the sign-offs and the paperwork the lease requires, and leave the space ready to move into. Modern Remodeling handles tenant improvements within about a hundred miles of Raynham. Call (781) 974-4263 to talk through your lease and your space.
See the rest of our commercial work, or browse the gallery for rooms we have finished.
How the job runs
Commercial work follows the same order every time, so you always know which part of the job you are in.
- First
Steve walks the space with you. He looks at what is there, asks what you want it to do, and tells you plainly what he sees.
- Then
We put the job in writing: the work, the materials you picked, the order it happens in, and the things that sometimes surprise people in older houses.
- During
The site is kept clean and the house is protected. When an inspection is due you know about it, and when a choice comes up you get it in time to think.
- Last
We finish with a walk through the work and a clean house. Loose ends get a date, and they get done on it.
Questions people ask about tenant improvements
Who pays for tenant improvements?
Whatever the lease and work letter say. Often the landlord provides a base building and an allowance, and the tenant pays for the rest. We price the work along the same split so each party can see its share.
Can you work for the landlord and the tenant on the same job?
Yes, as long as the contract makes clear who we work for on each piece. We keep landlord and tenant costs separate on every invoice and change order.
What does the landlord need from you before work starts?
Usually insurance certificates naming the landlord, approved drawings, a schedule, and agreement to follow the building's rules for hours, deliveries and shared areas. We provide those up front.
What if the base building is not delivered as promised?
We document what we find when we get access and tell both parties in writing. That gives the landlord and tenant a clear record to sort out under the lease before we build on top of it.
Do we still need a building permit if the landlord approved the plans?
Yes. Landlord approval is a lease requirement, not a permit. The building department reviews the drawings separately under the state building code and the accessibility rules.
More commercial work
Commercial Kitchen Construction
Commercial kitchen construction builds the back of house: framing behind the hood and equipment, washable walls and ceilings, floors that drain and room for the walk-in.
Medical Office Remodeling
Medical office remodeling reworks the space a practice already occupies, including exam rooms, the waiting area and staff space, while patients keep coming.
Dental Office Remodeling
Dental office remodeling reworks a practice around its chairs: the operatories, the utility runs the equipment needs and the sterilization area that keeps the day moving.
Medical Facility Construction
Medical facility construction builds a new clinic or outpatient practice, either inside an empty shell suite or as a new building.
Hotel Remodeling
Hotel remodeling refreshes guest rooms, baths, corridors and lobbies at hotels, inns and bed and breakfasts while the property keeps renting rooms.
Apartment Remodeling
Apartment remodeling is unit-by-unit work, usually done in the gap between one tenant moving out and the next moving in.
Get the job in writing
Monday to Friday 7 to 5, Saturday 8 to noon. Based in Raynham and working within about a hundred miles of it. See finished rooms in the gallery.